Thursday, November 28

German partners expose prepare for 10 MW offshore electrolyzer demonstration at Alpha Ventus

Home Hydrogen German partners expose prepare for 10 MW offshore electrolyzer demonstration at Alpha Ventus

November 27, 2024, by Ajsa Habibic

German overseas wind and hydrogen designers NorthH2, Deutsche Offshore-Testfeld- und Infrastruktur (DOTI), and the Offshore-Windenergie Foundation have actually signed up with forces to construct an overseas electrolyzer demonstrator at the Alpha Ventus wind farm in the North Sea.

Thanks To Alpha Ventus

In a relocation referred to as “a cutting-edge action for a sustainable energy future”the partners signed a letter of intent (LoI) on November 26, 2024, to interact on the building and construction of a 10 MW offshore electrolysis demonstrator at Germany’s very first overseas wind farm, Alpha Ventus.

This research study and presentation job becomes part of the NORTHSEA Hydrogen task pipeline established by NorthH2. It intends to show the expediency and effectiveness of hydrogen production straight at sea and test needed elements by utilizing a structure from a model wind turbine.

Power from Alpha Ventus will be utilized to provide the proton exchange membrane electrolyzer (PEM). The seawater will be desalinated utilizing the waste heat produced throughout electrolysis and then divided into hydrogen and oxygen in the electrolyzer.

The hydrogen will be saved and throughout low-wind durations reconversion will be evaluated. The partners stated choices for utilizing the hydrogen produced straight at sea are presently being examined.

As discussed, the amounts produced are too little for overseas loading and ship transportation to land to validate the high expenses of the matching logistics. As quickly as the AquaDuctus pipeline, which is part of the hydrogen core network, links the North Sea with the pipeline network on land, the demonstrator can be linked, and the hydrogen will be fed in.

According to the partners, this job is meant to offer crucial insights that will allow overseas electrolyzers to be run commercially at sea in the future.

A vital part of the task is to supply a platform for commercial partners and research study, accompanying eco-friendly research study, and to evaluate and enhance systems and elements under genuine conditions.

The job advancement and execution are likewise anticipated to use the authorities included the chance to develop the essential regulative structure for specs and approval of overseas electrolysis tasks.

Andreas Wellbrock, Managing Director of NorthH2, stated: “The 10MW offshore electrolysis demonstrator is an important action towards making it possible for the production of green hydrogen straight at sea. This will assist us to substantially increase the effectiveness and sustainability of hydrogen production while preventing the obstacles of grid connection problems.”

Karina Würtz, Managing Director of the Offshore-Windenergie Foundation, included: “The market ramp-up in the hydrogen sector is presently challenged with various technical and financial difficulties that require to be gotten rid of. This is a lot more real for hydrogen production offshore, i.e. at sea. Here, one ought to initially check with a cool head how the extreme conditions of the North Sea impact the innovation parts and upkeep requirements– we for that reason invite this effort and are happy to be able to supply a test chance on the Alpha Ventus test field location.”

  • Published: about 1 year ago

» …
Learn more