Dubai Electricity & & Water Authority (DEWA) is looking for candidates to style, supply, set up and commission a 2.5 MW alkaline electrolyzer turnkey job. The due date has actually been reached Dec. 9.
November 29, 2024 Patrick Jowett
Dubai
Image: Bo Zhang, Unsplash
DEWA is running a tender for the style, supply, setup and commissioning of a 2.5 MW alkaline electrolyzer turnkey job.
The complete tender files are offered to buy from DEWA’s site for AED 2,100 ($571.74).
The bidding was initially arranged to close in September, however the due date has actually been reached Dec. 9, according to a notification on DEWA’s site.
Previously this month, DEWA started a tender looking for advisory services from independent power manufacturers for a 1.6 GW solar task and a 1 GW battery energy storage system setup. The due date for applications is Dec. 17.
This material is safeguarded by copyright and might not be recycled. If you wish to comply with us and wish to recycle a few of our material, please contact: editors@pv-magazine.com.
Popular material